Free Wi-Fi Tools | Wifi Weave - Professional Network Planning
Back to Free Tools

WiFi Channel Planning Calculator

Plan optimal channel assignments for multi-AP deployments with interference analysis, regulatory compliance, and professional recommendations for maximum performance.

Deployment Configuration

Expected Interference Sources:

Microwave ovensBluetooth devicesNeighboring WiFi

Access Point Configuration

Important Disclaimer

For Educational and Estimation Purposes Only: The WiFi Channel Planning Calculator is provided as a free educational tool to help with preliminary Wi-Fi planning estimates. Results should not be used as the sole basis for professional network deployments.

Professional Consultation Required: For production networks, always consult qualified Wi-Fi professionals and conduct proper site surveys. Actual results may vary significantly based on environmental factors, building materials, interference, and specific requirements.

Calculation Methodology: Calculations are based on industry-standard formulas and best practices from IEEE 802.11 standards, but simplified for general use. Real-world deployments require detailed analysis of specific conditions.

Additional Considerations:
  • Channel assignments are based on theoretical optimal distribution and may require site-specific adjustments
  • Actual interference levels depend on physical environment and neighboring networks
  • Power level recommendations should be validated through on-site RF testing
  • Regulatory requirements vary by country and may change over time
  • Professional RF survey recommended for mission-critical deployments

Sources & References:

  • IEEE 802.11 Wireless LAN Standard
  • FCC Part 15 Regulations for Unlicensed Devices
  • ETSI EN 300 328 Harmonized Standard for Wireless Equipment
  • Wi-Fi Alliance Technical Specifications
  • Industry best practices for enterprise WiFi deployment

Limitation of Liability: Wifi Weave makes no warranties regarding the accuracy or completeness of these calculations. Users assume all responsibility for decisions based on these estimates.